Global Adjustment Explained

• Global adjustment covers the cost of building and maintaining new electricity infrastructure in the province, including energy contracts, as well as delivering Ontario’s conservation programs;

• All Ontario electricity consumers pay for global adjustment; for mid-sized and large businesses it will appear as a separate line item on their utility bill;

• Class A customers pay GA based on their peak demand during the top five provincial peak events;

• For each MW-equivalent of grid demand reduction during the top five 2019 Ontario peak events, consumers will save over $500,000 in 2021. A 3 MW facility utilizing an Ecomax® power plant would save over $1,8M annually.

The GA challenge

• Individual peak behaviour is evolving with a longer duration and a discernable flattening and shifting

• Curtailment and arbitrage, alongside evolving consumer patterns, are driving this peak shift

• Accurately predicting the exact timing when a peak occurs becomes increasingly difficult

The ECOMAX® solution

° ECOMAX® on-site power generation can eliminate the risk of missing a peak event

° The ECOMAX® operates on expected peak days for the entire peak period from early morning until late evening

° Operation can be automated through integrated controls and dispatching software

More information

Discover more on Global Adjustment! Leave your email address to receive a pdf document.

The ECOMAX® is an adaptable solution for changing market conditions

• The ECOMAX® solution not only provides all benefits of peak-shaving, but can also be used for back-up power to provide a resilient source of power in the event of a prolonged utility outage;

• Adaptable to changing market conditions, the ECOMAX® provides continuous power whenever the cost of electricity is higher than the cost of self-generation.

The ECOMAX® allows for additional revenue streams

• Automated dispatching when HOEP is higher than the cost of self-generation;

• Participation in Demand Response programs;

• Participation in capacity auctions;

• Power quality improvements;

• Additional heat recovery for hot water, steam or chilling purposes.

Cases Histories

CONESTOGA, (CANADA): 1 ECOMAX® 33 NGS
Total electrical power:  3.3 MW
GA Mitigation
Future Optional Heat Recovery
AB Maintenance Program Customized for GA Mitigation

POLYCON, MAGNA GROUP (CANADA): 3 ECOMAX® 27 NGS
Total electrical power: 8.1 MW
24/7 Runtime
Exhaust Heat Utilization Steam
Entire Installation Covered by AB Protection Plan

Benefits of continuous duty gas engine for ga displacement

Next steps and implementation timelines

Contact one of our experts

Customer Service CenterUseful numbers for technical assistance
Global presenceThe presence of AB in the world

AB Holding S.p.a.

Via Caduti del Lavoro, 13
25034 Orzinuovi (BS)
T. +39 030 99 42 411
info@gruppoab.com

Follow us
  • Corporate
  • AB Stories
  • Solutions
  • Products
  • Service
  • Innovation
  • Careers

Copyright 2021 AB HOLDING SPA - P.IVA 02243290984 - REA 433585 - Reg. imp. BS02243290984 - Cap. sociale 6.000.000 i.v.

Book a free consultation online
1